Tuesday, September 28, 2010

For posterity

I post only so that I can remember all that is happening. It is happening quite fast. After yearsw of thinking about remodeling, making excuses for not remodeling, lacking the courage to undertake the remodeling, being ambivalent about remodeling, and being downright too cheap, we finally took the plunge. The great remodel of the back bathroom, our master bathroom, and [drum roll] . . . the kitchen has begun.

The work actually started last Monday, September 20, with the demolition of the back bathroom. We left that morning, and by the afternoon, everything except the tub was gone. The next day, Bruce and Nellie replaced old insulation and damaged drywall.

Then came Wednesday and demolition of the kitchen. Bruce and Nellie don't play! We left that morning, and by the afternoon, all the old cabinets were out, the built-in china cabinet gone, the flooring removed, and the appliances in the dumpster. The kitchen was just a shell.

Thursday, new drywall in the kitchen, measurements for the pass-through and the mud guys started their work. Those guys work hard for their money. As we sat cackling over mindless TV, they were prepping the drywall and texturing the back bathroom and kitchen. I don't know what happened on Friday because I left for the recruiting forum in LA. but I believe the mud guys finished texturing both the back bath and the kitchen.

Yesterday was too exciting for words! We stayed up late Sunday emptying our bathroom cabinets. On Monday when I left, the kitchen was still little more than a shell; the back bath was a shell, and our bathroom had all the old cabinets and counters. When I arrived home, it was as though the remodeling fairy waved her magic wand! New kitchen cabinets were set; the back bath cabinets were set, and the old vanities in our bath were removed and new doors for some cabinets and the new vanity cabinets were set. Cabinets, cabinets everywhere! It was so much fun finding the little design touches that we weren't expecting. The 45 degree angles on the bottoms of base cabinets; the end panels with the same detail as the doors; the new end cabinet for the telephone books and other stuff. It was quite exciting to see the new drawers in places that we hadn't had them before. Plus, the crown moulding was installed in the kitchen and back bathroom.

Tonight as I sit recording this at 9 pm, the mud/paint guys are priming the cabinets. Bruce and Nellie finished the demolition of our bathroom earlier in the day, replaced damaged drywall, installed can lights in the kitchen, and the plumber was here.

There are boxes everywhere, but this too shall pass. And we'll have a pretty new kitchen plus updated bathrooms to boot.